精品国产福利一区二区在线,欧美另类久久久精品,国产日韩欧美亚洲综合首页

Zhanjiang Wei Da Machinery Industry Co., Ltd.

全球經(jīng)典案例

Search Form Example
Search Icon

Position Actuelle : Accueil > Exemples de Projets d'Ingénierie >

推薦新聞

Recent News

熱烈祝賀湛江偉達機械獲得...

喜訊!熱烈祝賀偉達機械獲...

坡頭區(qū)創(chuàng)新發(fā)展大會召開,...

“天然橡膠加工機械創(chuàng)新中...

賴偉平董事長受邀到江蘇強...

廣饒國際橡膠輪胎暨汽車配...

An 8,400-ton Natural Rubber TSR20 Production Line in C?te d'Ivoire

Date: June 1, 2019

Engineering Project :

Natural Rubber TSR20 Production Line

Processing Materials :Natural Rubber, Cup Rubber

Annual Capacity :8400Tons

Finished Product :TSR 20

Year and Place :Cote d'Ivoire 2017

Matching Heat Source :Diesel Furnace

Cote d'Ivoire is the largest rubber plantation in Africa. Its rubber production accounts for 60% of Africa's total output, which ranking first in Africa and seventh in the world.

The entire project process includes the following 8 items

Crepe dehydration - Shred - Dry - Package Creper - Hammer Mill Machine- Drying Line (including Fan, Drying Trolley, Embedded Parts, Thermal Insulation and Sealing Material, etc.) - Packing Machine

1. Less configurating equipment; 2. Low investment cost.

First time to join the rubber processing industry, do not want to invest many equipment or have the budget limit, could think about this production line proposal .

Retour en haut

                  主站蜘蛛池模板: 保定市| 葵青区| 阳山县| 大同县| 盐山县| 旺苍县| 上高县| 岳普湖县| 任丘市| 项城市| 额敏县| 滦南县| 河北区| 蒙阴县| 大荔县| 家居| 无锡市| 潼南县| 绍兴市| 沛县| 肇东市| 新源县| 清流县| 长兴县| 舒城县| 长子县| 尼勒克县| 延边| 普兰县| 察雅县| 武穴市| 萨迦县| 昂仁县| 贵南县| 达州市| 牙克石市| 三门峡市| 永和县| 宁国市| 浑源县| 廉江市|