精品国产福利一区二区在线,欧美另类久久久精品,国产日韩欧美亚洲综合首页

Zhanjiang Wei Da Machinery Industry Co., Ltd.

全球經(jīng)典案例

Search Form Example
Search Icon

Position Actuelle : Accueil > Exemples de Projets d'Ingénierie >

推薦新聞

Recent News

熱烈祝賀湛江偉達機械獲得...

喜訊!熱烈祝賀偉達機械獲...

坡頭區(qū)創(chuàng)新發(fā)展大會召開,...

“天然橡膠加工機械創(chuàng)新中...

賴偉平董事長受邀到江蘇強...

廣饒國際橡膠輪胎暨汽車配...

An 8,400-ton Natural Rubber TSR20 Production Line in C?te d'Ivoire

Date: June 1, 2019

Engineering Project :

Natural Rubber TSR20 Production Line

Processing Materials :Natural Rubber, Cup Rubber

Annual Capacity :8400Tons

Finished Product :TSR 20

Year and Place :Cote d'Ivoire 2017

Matching Heat Source :Diesel Furnace

Cote d'Ivoire is the largest rubber plantation in Africa. Its rubber production accounts for 60% of Africa's total output, which ranking first in Africa and seventh in the world.

The entire project process includes the following 8 items

Crepe dehydration - Shred - Dry - Package Creper - Hammer Mill Machine- Drying Line (including Fan, Drying Trolley, Embedded Parts, Thermal Insulation and Sealing Material, etc.) - Packing Machine

1. Less configurating equipment; 2. Low investment cost.

First time to join the rubber processing industry, do not want to invest many equipment or have the budget limit, could think about this production line proposal .

Retour en haut

                  主站蜘蛛池模板: 定日县| 黄陵县| 班戈县| 进贤县| 晋中市| 浮梁县| 田东县| 双流县| 康平县| 页游| 唐河县| 临桂县| 长汀县| 建宁县| 武威市| 图们市| 海兴县| 蓝山县| 新闻| 邵阳县| 曲沃县| 鄂尔多斯市| 开阳县| 上栗县| 辰溪县| 黄龙县| 会宁县| 寻甸| 于田县| 阿图什市| 襄垣县| 女性| 西安市| 阳西县| 靖宇县| 林周县| 明星| 尚志市| 乃东县| 莫力| 高邮市|